This project involved the installation of precise interior demising walls within a large-scale industrial warehouse.
Project Type
Square Footage
GC Partner
Scope Performed
Project Description
Designed to subdivide open floor space into functional zones, the work required meticulous layout, framing, and finish execution to meet operational and safety requirements.
The project scope included interior metal stud framing, drywall installation, and finishing for multiple demising partitions. Focus was placed on coordination with existing MEP systems and overhead warehouse infrastructure to minimize conflicts and maintain uninterrupted operations.
Project Timeline
Mobilization & Site Prep
Setting up trailers, tools, materials, safety protocols
Interior Metal Stud Framing
Layout and installation of metal studs for walls and partitions
Drywall Installation & Finishes
Hanging drywall, taping, sanding, and first coat finishes
Acoustical Ceilings
Suspension system installation, tile placement, and final inspections
Door & Hardware Installation
Installation of doors, frames, locks, and hardware
Architectural Finish Components
Millwork, wall panels, trim, and decorative elements
Coordination & Final Punch
Field coordination, inspections, rework corrections, and turnover
Project Closeout
Documentation, final inspections, client walkthroughs