7521 Jefferson Ave – Skanska
The interior scope was delivered on schedule with minimal rework. Field coordination ensured smooth inspections and streamlined turnovers.
Project Type
Square Footage
GC Partner
Scope Performed
Project Description
Delivered in partnership with Skanska, this project involved comprehensive Division 9 scope execution within an active commercial development. The work required disciplined coordination, structured supervision, and schedule-driven manpower to maintain alignment with overall project milestones.
Our team operated within a multi-trade environment, ensuring framing, drywall, ceilings, and finish elements were installed without disruption to critical path activities.
Project Timeline
Mobilization & Site Prep
Setting up trailers, tools, materials, safety protocols
Interior Metal Stud Framing
Layout and installation of metal studs for walls and partitions
Drywall Installation & Finishes
Hanging drywall, taping, sanding, and first coat finishes
Acoustical Ceilings
Suspension system installation, tile placement, and final inspections
Door & Hardware Installation
Installation of doors, frames, locks, and hardware
Architectural Finish Components
Millwork, wall panels, trim, and decorative elements
Coordination & Final Punch
Field coordination, inspections, rework corrections, and turnover
Project Closeout
Documentation, final inspections, client walkthroughs